I’ve been training Karim to enjoy purchasing second hand materials so we don’t run out of money. As you can see, he’s come a long way from the 350Z sports car te he he
The energy assessment for the house has been completed (7.7 stars), house plans have been signed off by the engineer, we received the Certificate of Likely Compliance from the Building Surveyor, and the final drawings are now with council for our building application, so we hope to receive the permit this side of Christmas.
Council knocked back our waste water design because it was designed to accommodate tank water only, when the property has been connected to reticulated water supply (which is murky brown dam water from up the hill). Even though we won’t connect the house to this water supply, Council say that a future owner of the property might, and if they do, they generally won’t be as conservative with their water usage, so the reedbed has to be larger. Why anyone would want to shower in brown dam water when there is 40,000L of clean rainwater storage is beyond us, but that’s beaurocracy for you!
Our friend who is a model boat builder has been building a model of the golden spiral clerestory, so that we can design the nautilis ceiling soffits accurately, and position studs in the walls to support it, as well as plan the wiring for lighting. The process has been invaluable, as we discovered a few changes that were necessary. The benefit of tweaking the design on a one metre long model versus the nine metre long real thing is obviously enormous. This view is looking at it from outside the house, with the small squares being the clerestory windows. In the lounge room we’ll be sitting inside the spiral, which has a higher ceiling that will house the nautilis soffits, and the flat board you can see around the outside edge depicts the height of the lower flat ceiling around the surrounding kitchen and dining room.
The earthworks have been completed, and the footings contractors are currently quoting so we can pour the footings in early January. Bob ripped out the old cottage slab, and we used the concrete underneath part of the driveway that needed extending.
Once the house site was level, we created an upper terrace to aid drainage away from the house, and to create a guest carpark and elevated outdoor entertaining area, which we have already christened with Ben and Anna.
The final stage was to position rocks along the embankment that curves around the house, and the result was really stunning. We can actually picture the house nestled in there now.
We took a few soil samples from the site and confirmed that we have the perfect ingredients for the render and earthen floors.
So have saved and stockpiled an enormous amount of clay next to the house site. The excavator operator thought we were very strange asking us to save the clay so we could build our house with it, but we look forward to showing him the end result one day.
One of the many benefits of attending the strawbale working bee last month was discovering the various qualities of the straw bales. This led us to re-visit the farmers and change suppliers. The bales we had ordered were only about 11kg, versus the bales we are now getting, which are around 20kg – double the compression meaning considerably stronger walls. To weigh the bales we borrowed some butchers scales from a friend, and were greeted by their rescued wombat Matilda, which really made our year.
This month I went on an Adobe floor workshop run by a lady named Chloe, who taught at Cal-Earth Building School. I learned so much, confirmed that we definitely want earthen floors in the dining and lounge room, and met some wonderful new friends. We spent an ernomous amount of time getting rocks out of the clay, which in itself was a valuable lesson to learn, as we’ll have our clay sifted and ready to use in advance.
The property was a meditation retreat, and the owner didn’t want to use any machinery, so we tramped the mix with our feet and kneaded the adobe onto the floor with our hands. That was great fun, in a seven metre diameter tipi, but for our 70 square meters of earthen floor we may engage the help of a mortar mixer, or a few cows at least!
The result really was beautiful. Here you can see the cracked clay pad that the tipi originally sat on, and a section of the smooth new earthen floor that we installed.
The following week we taught our fourth Tassie Introduction to Permaculture course, which was fantastic. Ten people came along for the weekend, including three people from the Adobe floor workshop. We changed the agenda for the weekend quite a bit, mostly because there are so many brilliant examples of permaculture principles in the garden now. So we spent a whole day on the property rather than two days in the classroom venue and only two hours on the property, and it was really beneficial.
We only had two negative events during the month, the first being the loss of another chook, Isis. She was fine when we put them to bed, but was dead underneath the perch the following morning. There definitely wasn’t any kind of intrusion or attack from another animal, so we really have no idea what happened to her. Maybe a bad dream leading to a heart attack!
And we found a tiger snake in the garden, which had unfortunately become tangled in some netting that surrounds the duck enclosure and died. We felt really bad because they are such an important part of the system, but also somewhat traumatised that we could have easily gone to turn the compost and not seen it. We’ll need to be extremely cautious in the garden now, which isn’t easy considering it’s like a jungle in there so you can’t really see what’s around the corner!